Design & Engineering

Back to Home Page

Design & Engineering Gantt Chart

Gantt Chart Sample
(Sample Gantt chart for Design tasks)

Conceptual Design

Completion: 30%
Task Details Status
General Arrangement
  • Deck layouts for all levels
  • Cargo holds and machinery spaces
  • Accommodation and bridge arrangement
  • Access routes and safety boundaries
Main Specifications
  • Principal dimensions and capacities
  • Service speed and endurance
  • Crew size and operational profile
  • Environmental design conditions
Design Basis
  • IMO, SOLAS, MARPOL compliance
  • Classification society requirements
  • Flag state regulations
Feasibility Studies
  • Market and operational analysis
  • Preliminary cost estimation
  • Environmental impact review
  • Initial risk assessment
Hull Form Selection
  • CFD and propulsion studies
  • Seakeeping and maneuverability checks
  • Initial hull shape selection
Initial Environmental & Safety Considerations
  • Emission control strategies
  • Ballast water management
  • Fire safety concept
  • Life-saving appliance planning
Preliminary Weight & Stability Estimates
  • Lightship and deadweight breakdown
  • Initial stability curve calculation
  • Weight tracking setup
Preliminary Risk Register
  • Design and operational risks
  • Environmental risk identification
  • Register setup for tracking
Stakeholder Engagement
  • Client workshops and feedback
  • Regulatory consultations
  • Operator input sessions
Concept Review & Approval
  • Internal design review
  • Client sign-off process
  • Regulatory pre-approval checks

Basic Design

Completion: 20%
Task Details Status
Hull Structure
  • Midship section and framing
  • Bulkhead and deck plating arrangement
  • Structural analysis and material selection
Machinery Layout
  • Engine room and machinery foundations
  • Shafting and auxiliary systems layout
  • Ventilation and access planning
Stability Calculations
  • Intact and damage stability analysis
  • Compliance with loading conditions
Weight Estimates
  • Estimates for steel and outfitting
  • Machinery and consumables weight estimation
  • Weight tracking and documentation
Preliminary System Diagrams
  • Electrical and piping system diagrams
  • HVAC and fire protection routing
  • Bilge and ballast system layouts
Regulatory Review
  • Submission to classification society
  • Flag state regulatory review
  • Approval meetings and documentation
Initial Procurement List
  • Identification of major equipment
  • Long lead items and vendor evaluation
Preliminary Safety & Environmental Plan
  • Fire zones and muster stations
  • Evacuation and ballast water management
  • Emission control strategies
Preliminary Construction Sequence
  • Block assembly and hull erection
  • Outfitting and critical path identification
Basic Design Review & Approval
  • Internal review and client sign-off
  • Class pre-approval process

Detailed Design

Completion: 25%
Task Details Status
3D Modeling
  • Full ship 3D model development
  • Vendor models integration
  • Clash detection and resolution
  • Walkthroughs and digital twin preparation
Production Drawings
  • Assembly drawings and nesting plans
  • Outfitting and welding details
System Routing
  • Piping and cable tray routing
  • HVAC and fire protection system integration
Material Take-Off
  • Bill of materials preparation
  • Procurement packages creation
Integration
  • Discipline coordination and clash resolution
  • Interface management
Supplier Data Integration
  • Vendor drawings and QA documents
  • Certificates and manuals collection
Change Management
  • Design change log maintenance
  • Approval workflow setup
  • Document management system
Detailed Safety & Environmental Plan
  • Fire protection and life-saving appliances
  • Ballast water and emission control measures
Detailed Construction Sequence
  • Block assembly schedule development
  • Hull erection and outfitting sequence
  • Risk mitigation strategies
Quality Assurance & Inspection Plan
  • Inspection points and acceptance criteria
  • QA audits and reporting
Maintenance & Lifecycle Considerations
  • Inspection access and spare parts planning
  • Lifecycle cost analysis
Detailed Design Review & Approval
  • Internal review and client sign-off
  • Class approval process

Class & Regulatory Approvals

Completion: 40%
Task Details Status
Classification Society
  • Plan approval and survey coordination
  • Class notations and compliance checks
Flag State Approval
  • Compliance with flag state regulations
  • Submission of safety and pollution documents
IMO/SOLAS/MARPOL Compliance
  • Safety and pollution prevention measures
  • Crew accommodation standards
Documentation
  • Design calculations and stability booklets
  • Drawings and certificates compilation
Regulatory Meetings
  • Coordination with authorities
  • Pre-inspection meetings and follow-ups
Approval Tracking
  • Status monitoring and revision management
  • Compliance reporting to authorities
Environmental Compliance
  • Ballast water management plan
  • Emission compliance documentation
Safety Compliance
  • Fire safety plan development
  • Life-saving appliance approval process
Crew Accommodation Compliance
  • ILO MLC 2006 compliance checks
  • Cabin size and sanitary facilities verification
Final Approval & Certification
  • Class certificate issuance
  • Flag state registration
  • IMO number assignment

Design Coordination & Review

Completion: 50%
Task Details Status
Interdisciplinary Coordination
  • Weekly meetings and design interface management
  • Resolution of design conflicts
Design Review Workshops
  • Formal reviews at each design stage
  • Class and regulatory authority participation
Client Review & Feedback
  • Presentations and feedback sessions
  • Change request management
Design Change Log
  • Tracking of design changes and reasons
  • Impacts and revision control
Design Risk Assessment
  • Identification and mitigation of risks
  • Risk register updates and action tracking
Constructability Reviews
  • Assessment of construction sequence and access
  • Maintenance and serviceability reviews
Value Engineering Workshops
  • Cost optimization and design improvement
  • Alternative evaluation and selection
Lessons Learned & Best Practices
  • Continuous improvement and feedback loop
  • Documentation of lessons learned
Design Documentation Control
  • Document management and versioning
  • Access control and archiving

Digital Engineering & Tools

Completion: 60%
Task Details Status
CAD Software
  • AutoCAD, Rhino, Siemens NX usage
  • Aveva Marine, ShipConstructor applications
CFD & FEA Tools
  • STAR-CCM+, ANSYS, NAPA for simulations
Document Management
  • SharePoint and BIM 360 for document control
Collaboration Platforms
  • Microsoft Teams, Slack for communication
  • Primavera, MS Project for planning
Data Exchange
  • Integration of vendor data and 3D models
  • Specifications and documentation exchange
Design Automation
  • Parametric modeling techniques
  • Automated bill of materials generation
Virtual Reality & Visualization
  • VR walkthroughs for design review
  • Augmented reality for assembly guidance
Digital Twin Preparation
  • Data structure and sensor integration
  • Monitoring system planning
Cybersecurity & Data Protection
  • Secure storage and access control
  • Backup and disaster recovery planning
Design Analytics & Reporting
  • Progress tracking and KPI dashboards
  • Automated reporting setup

Design Deliverables

Completion: 35%
Deliverable Details Status
General Arrangement Drawings
  • Main deck, lower deck, upper deck layouts
  • Bridge deck and accommodation block arrangement
  • Cargo hold and machinery space layouts
Hull Lines Plan
  • Body plan, waterlines, buttocks, diagonals
  • Fairing records and hull form details
Midship Section & Structural Drawings
  • Scantlings, plating, stiffeners, frames
  • FEA analysis reports and material specifications
Machinery Arrangement Drawings
  • Engine room layout and machinery foundations
  • Piping and ventilation arrangements
System Diagrams (Piping, Electrical, HVAC)
  • Single line diagrams and system schematics
  • Routing plans and equipment lists
Production Drawings & Nesting Plans
  • Block assembly drawings and steel cutting plans
Stability Booklet & Loading Manual
  • Intact and damage stability calculations
  • Loading conditions and ballast plans
Fire & Safety Plans
  • Fire zone layout and detection systems
  • Suppression systems and life-saving appliance locations
Class Approval Certificates
  • Hull, machinery, electrical, safety certificates
  • Environmental compliance certificates
Bill of Materials
  • Steel, equipment, outfitting, consumables lists
  • Procurement packages preparation
3D Model Files
  • Native CAD files in IFC, STEP, IGES formats
  • Vendor models and integration files
Design Change Log
  • Revision history and change requests
  • Approvals and impact assessments
Quality Assurance Documentation
  • Inspection and test plans development
  • NDT reports and QA audits
Environmental & Safety Compliance Documents
  • Ballast water management plan
  • Garbage management plan
  • Emission compliance documentation
Construction Sequence & Assembly Plans
  • Block assembly schedule and hull erection plan
  • Outfitting sequence and critical path
Lessons Learned & Best Practices
  • Continuous improvement feedback documentation
Lifecycle Maintenance Documentation
  • Maintenance access plans and spare parts strategy
  • Lifecycle cost analysis documentation
Stakeholder Review Records
  • Client feedback and regulatory comments
  • Approval certificates documentation
Digital Twin Data Package
  • Sensor locations and monitoring system specs
  • Integration plans and data management
Design Analytics Reports
  • Progress tracking and KPI dashboards
  • Automated reporting setup